Civil works & cable installation for duel Circuit 110kV Underground Cable. Route length of approx. 6,000m.
Olex Cables / Energex
110kV Dual Circuit
Civil works & cable installation for Double Circuit 33kV Underground Cable. Conduit Length 800m.
Energex
33kV Double Circuit
Civil works & cable installation for Triple Circuit 110kV Underground Cable. Route length of approx. 2660m.
Olex Cables / Transpower
110kV Triple Circuit
Civil works & cable installation for Dual Circuit 132kV Underground Cable. Route length of approx. 12,100m.
Olex Cables / Energex
132kV Dual Circuit
400kV Design and Construct
Relocation and underground of existing overhead 66kV sub-transmission lines to allow for construction of additional eight lanes for the West Gate Tunnel Project.
Powercor and Jemena – VIC
66kV Double and Triple Circuit
Installation of a single 220kV circuit to connect the existing Albany Substation to Hobson Substation in Auckland NZ including cable installation over the Auckland Harbour Bridge to provide additional transmission capacity.
Transpower – New Zealand
220kV Cable Installation
Design and construct to relocate 66kV circuits including transition jointing of new XLPE cables to existing oil filled cables to allow for construction of the new State Library station for the Metro Tunnel Project.
CitiPower – VIC
66kV Transition Jointing
Design and construct of four turnkey 66kV circuits from the Melbourne CBD to Brunswick Terminal Station to increase the capacity and redundancy of the sub-transmission network.
CitiPower – VIC
66kV Design and Construct
Design and construct for a single 132kV circuit to connect the existing Hay Street and Milligan Street Substations in Perth CBD to provide additional transmission capacity.
Western Power – WA
132kV Design and Construct